For roughly a century, the United States has had the world's biggest economy.
A large portion of our economic strength is in the infrastructure we have
constructed. Much of this infrastructure, which was built prior to or shortly
after World War II, is reaching the end of its anticipated service life.
There is a tremendous need to rehabilitate these normally out-of-sight/out-of-mind
buried assets if they are to help us improve our quality of life. Proactive
rehabilitation programs effectively manage the costs of system replacement
and minimize risk and sociological impacts from aging infrastructure. As
an industry leader, Dibble brings value to our clients through trenchless
technology by recommending and implementing the right methodology for condition
assessment and rehabilitation. Dibbles services include engineering
design and construction quality control for:
- Cured in Place Pipe (CIPP)
- Pipe Bursting
- Slip Line
|