About

Careers

Community

Contact

Recent News

Video

Oridian

Services



 



 

   

Site Navigation

 


Survey/GIS

Florence Retarding Dam - Design of Emergency Spillway
Sky Harbor International Airport, Phoenix, Arizona

Dibble provided survey controls and topographic check for the as-built drawings, developed cross-sections for hydraulic analysis, conducted sediment storage evaluation, and calculated reservoir volume loss due to dam realignment. A model to evaluate the hydrology of the 62.5 square mile watershed upstream of the five-mile dam was facilitated by the use of GIS. The GIS-based hydrologic model was used to generate peak flows for 100-year flood events involving 6-hour and 24-hour duration storms, and for the probable maximum flood (PMF) required for the design of the emergency spillway.

 
.
* mouse over images to magnify,
use click wheel to zoom.

Owner: Florence Area Watershed Flood
              Control District

Download

© 2010, Dibble Engineering, 7500 North Dreamy Draw Drive, Suite 200, Phoenix, AZ 85020 | P 602.957.1155 | F 602.957.2838