About

Careers

Community

Contact

Recent News

Video

Oridian

Services



 



 

   

Site Navigation

 


Transportation

US 60 Higley Road Traffic Interchange
Mesa, Arizona

Dibble provided transportation design services to widen Higley Road to 10 lanes over US 60, and to add 24 feet on each side of the bridge with pre-cast box beams. Traffic maintenance was a key concern, as construction was on going for a major widening of US 60, the Banner Gateway hospital campus, and widening of Higley Road matching in south of the project. To meet schedule demands of the hospital opening, this TI widening design was completed in 4 months. Coordination with the US 60 designer, Banner Health, and the Town of Gilbert was crucial and constant. This project also included coordination with the Roosevelt Water Conservation District and other utility relocations.

 

* mouse over images to magnify,
use click wheel to zoom.


Client: Arizona Department of Transportation

Download

Additional Photos

© 2010, Dibble Engineering, 7500 North Dreamy Draw Drive, Suite 200, Phoenix, AZ 85020 | P 602.957.1155 | F 602.957.2838