Sonoran Boulevard, 15th Avenue to 10th Street, and Dove Valley Road, 23rd Avenue to 19th Avenue
Phoenix, Arizona

This CM@R project included civil design services for paving, drainage structures, and landscaping for Sonoran Boulevard between 15th Avenue and 10th Street (West Segment). The West Segment is one of three adjacent projects that provide an important east-west connection through north Phoenix and the Sonoran Preserve from 15th Avenue to Cave Creek Road (approximately 6.5 miles). The three projects were designed concurrently by three separate design teams, who coordinated closely to ensure consistent design and construction documents throughout the scenic corridor. The West Segment is approximately 2.1 miles and includes a 150-foot right-of-way, 64-foot roadway width, several drainage crossings, waterline relocation landscaping, and street lighting. Extensive coordination was required with the Arizona State Land Department, Salt River Project, property owners to the south, and the City Parks Department.

 



Owner: City of Phoenix

Download

Additional Photos

© 2010, Dibble Engineering, 7500 North Dreamy Draw Drive, Suite 200, Phoenix, AZ 85020 | P 602.957.1155 | F 602.957.2838