Papago Park Center’s Grand Canal Multipurpose Path

Our Land Development Team worked diligently in providing grading and drainage plans, pavement section design, and typical sections for a multipurpose pass within the SRP Canal Right-of-Way. The design ties into existing canal and roadway improvements, will connect to existing path east of the site and will continue to the west for future connections.
 
Geotechnical is included on the team as part of this scope to provide the pavement/surface design and for material testing during construction. The existing SRP geotechnical investigations will be used for the pavement/surface design.

For more info: http://www.cbs5az.com/story/34517461/new-canal-path-part-of-larger-papago-park-center-development