Flood Control

Committed to Bringing Flood Relief Methods and Reducing the Risk of Natural Hazards to our Communities

Floods can be powerful, unpredictable, and costly. Once the rain starts falling, it is too late to take significant actions to manage them. Proactive investments in engineering and flood control infrastructure before the storms arrive save money, property, and perhaps lives. Dibble’s Flood Control practice provides proven and innovative solutions for managing stormwater. Our expertise ranges from state-of-the-art stormwater modeling techniques to forward-looking master plans to comprehensive construction documents and construction phase services. We act as trusted advisors to our clients by protecting the public and its valuable infrastructure.

Interested in joining our Team? Visit our Careers page.

Services

  • Studies and Master Plans
  • Capital Improvement Programs
  • Construction Documents
  • Construction Phase Administration
  • Regulatory Floodplain Permitting
  • FEMA Letters of Map Change
  • Infrastructure Funding Application Assistance
  • 1D and 2D Hydrologic and Hydraulic Modeling
  • Scour, Erosion, and Stream Bank Protections
  • Channel, Storm Drain, Culvert, and Retention Systems
  • Special Hydraulic Structures
  • Levee/Dam Breach Analyses and Emergency Action Plans

Additional Projects and Insights

PROJECTS

Lone Butte Wastewater Plant Breach Analysis and Slope Evaluation
Location: Chandler, AZ
Owner: City of Chandler
Cost: $67K

Watson Drainage System Pre-Design
Location: Buckeye, AZ
Owner: Flood Control District of Maricopa County (FCDMC)
Cost: $473K

Smucker Park Detention Basin
Location: Yuma, AZ
Owner: Yuma County
Cost: $989K

Lower El Mirage Wash Basin Design and Construction Administration
Location: El Mirage, AZ
Owner: FCDMC
Cost: $1.8M

Downtown Buckeye Storm Drain
Location: Buckeye, AZ
Owner: Town of Buckeye
Cost: $532K

 

Wildlife Perimeter Fence Design-Build Phase 1
Location: Pueblo, CO
Owner: Pueblo Memorial Airport
Cost: $45K

Monument Valley Wash Crossing
Location: Navajo Nation, AZ
Owner: Navajo Division of Transportation
Cost: $30K

Bullard Wash Letter of Map Revision and Design
Location: Goodyear, AZ
Owner: City of Goodyear
Cost: $135K

Arizona Public Service (APS) HUBwest Hydrology Update and Design
Location: Buckeye, AZ
Owner: APS
Cost: $35K

Intake Transfer and Release Facility/Detention Facility
Location: Phoenix, AZ
Owner: Maricopa County Facilities Management
Cost: $16K