Water
Committed to Designing High-Quality, Reliable Water Systems for our Communities
Featured Projects
Arizona State University (ASU) Waterline Replacements
University of Colorado Boulder Chilled Waterline Expansion
35th Avenue Storm Drain Investigation
Santiago Trail Water Facility (D-B) Reservoir and Pump Station
Zone 3D/4A 42-inch Water Transmission Main
Connection to the Fairgrounds Wastewater Reclamation Facility to the Conveyance System
23rd Street Sewer Capacity Augmentation
Central Mesa Reuse Pipeline Alignment
Lake Havasu Wash Improvements Design
Additional Projects
Steel Reservoir Rehabilitation
Tempe, AZ
Owner: City of Tempe
Cost: $5.1M
Adonis Lift Station and Force Main
Marana, AZ
Owner: Town of Marana
Cost: $123,378
Ocotillo Road 12-inch Sewer Replacement
Queen Creek, AZ
Owner: Town of Queen Creek
City of Prescott: Chino Valley 5 MG Tank
Prescott, AZ
Owner: City of Prescott
Cost: $4.5M
EPCOR Water: Desert Hills Filling Station
Anthem, AZ
Owner: EPCOR Water
Cost: $1.1M
Avra Valley Augmentation Transmission Main Route Study and Design
Tucson, Arizona
Owner: City of Tucson
Cost: $82M Engineer’s Program Cost
$45M Program Budget
Scenario 6 Water Transmission Main
Phoenix, Arizona
Owner: City of Phoenix
Cost: $7.8M
Val Vista Transmission Main
Mesa, Arizona
Owner: City of Mesa
Cost: $13.7M
SROG Interceptor Capacity Study
Phoenix, Arizona
Owner: City of Phoenix
Cost: $65M
Old Nogales Interceptor Augmentation
Tucson, Arizona
Owner: Pima County
Cost: $65M