Stabilizing Lake Havasu City’s Washes

Dibble Engineering is excited to be working with Lake Havasu City on their bank stabilization efforts! Havasu’s system of washes are unprotected channels that regularly experience erosion, scour, sedimentation and head-cutting from storms. The company says some Havasu utilities may be at risk from the deterioration of washes, and Dibble Engineering is designing a system of cost-effective modular structures that will stabilize the wash-beds and re-establish their natural elevations over time.

Back To Insights

Heather Brown