Arizona State University Sun Devil Stadium Renovation
A Stadium Renovation and New Student Athletic Facility
Dibble provided survey, civil engineering and limited construction administration for the renovation of the existing Sun Devil Stadium and construction of a new Student-Athlete Facility at Arizona State University. The stadium area is 800,000 sf, with a seating capacity of 55,000. The project was completed in three design phases, with construction occurring over multiple football seasons.
In Phase 1, Dibble designed the grading and drainage, paving, and utilities for the demolition of the existing south end zone seating and construction of a new student seating section and student club section with associated restrooms and concessions. Our team analyzed and designed the utilities during Phase 1 for future phases.

In Phase 2, Dibble designed grading, drainage, and utility improvements for the reconstruction of the main concourse and lower bowl, which included ramps to the main concourse and field-level paving and grading. Our team also designed circulation improvements.

In Phase 3, Dibble designed the grading and drainage, paving, and utilities for the Student-Athlete Facility and site improvements at the north and south of the stadium. This included designing an Americans with Disabilities Act (ADA)–accessible route from the State Farm campus to an area on the south side of Veterans Way and the stadium.
This project is LEED Gold certified.
Details
Client
Arizona State University
Location
Tempe, AZ
Scope
$539K
Total Cost
$304M
Project Lifecycle